Ελληνική έκδοση  English version  facebook  linked in
HOME / PROJECTS / BRIDGES / SPAN BY SPAN CAST IN SITU / RAMP5 UNIT1
RAMP5 UNIT1
  • span by span cast in situ bridge
  • span nby span cast in situ method construction
  • bridge construction materials
  • workers in bridge construction
  • bridge construction overview
  • semi finished bridge
  • Structural model of interchange
Close ( Click on the image )

PROJECT DETAILS

Owner: Kuwait Ministry of Public Works
Construction: -
Location: Kuwait
Construction Method: Cast in situ Span By Span using temporary formwork
Max span: 45.00m
Maximum pier height: 18.00m
Bridge arrangement: 4 spans (35.00+45x5+35)=295.00m
Deck section: cast in situ box girder 2.25m depth, 11.60m traffic width
Pier section: Rectangular type
Foundation: Deep foundation through piles diameter D=1.20m
Services: Checking final Design
Comments: As per AASHTO LFRD 5.10.3.5 not more than 50% of longitudinal post tensioning tendons is coupled at one section