NASSER ROAD TROUGH
Construction: Rizzani De Eccher, SPA- Italy, Obrascon Huarte Lain, SA - Spain, TREVI, SPA- Italy, Boodai Construction- Kuwait
Location: Kuwait
Construction Method: Using excavation equipment, Land Crane
Total length: 717.00m
Section traffic width: 34.10m covering 2 directions
Trough arrangement: 6 Different panels categories
Foundation: With tension piles diameter D=60cm
Services: Design check/Shop Drawings check/Construction Supervision
Comments: Special care during construction due to existing pipes and high water level.
PROJECT DETAILS
Owner: Kuwait Ministry of Public WorksConstruction: Rizzani De Eccher, SPA- Italy, Obrascon Huarte Lain, SA - Spain, TREVI, SPA- Italy, Boodai Construction- Kuwait
Location: Kuwait
Construction Method: Using excavation equipment, Land Crane
Total length: 717.00m
Section traffic width: 34.10m covering 2 directions
Trough arrangement: 6 Different panels categories
Foundation: With tension piles diameter D=60cm
Services: Design check/Shop Drawings check/Construction Supervision
Comments: Special care during construction due to existing pipes and high water level.