Ελληνική έκδοση  English version  facebook  linked in
HOME / PROJECTS / UNDERGROUND STRUCTURES / MSE WALLS / JRB MSE WALLS
JRB MSE WALLS
  • JRB mse wall retaining system
  • mse wall construction site of JRB ramp
  • retaining system with MSE WALLS
  • MSE WALL structural model design
Close ( Click on the image )

PROJECT DETAILS

Owner: Kuwait Ministry of Public Works
Construction: Arab Contractors Company (ACC) - Othman Ahmed Othman
Location: Kuwait
Construction Method: Conventional using Land Crane
Panel section: min thickness 180.00mm, min embedded h=750.00mm
Section: Using Precast Panels and Precast Barrier at the top and Geostrap 5 Grade 50 for steel connection
Services: Complete Design check/Construction Supervision
Comments: Structural Stability from Impact Load as per AASHTO.