G2 RAILWAY BRIDGE
  • G2 bridge, constructed with the precast beam method
  • G2 bridge Ikonio
  • G2 railway bridge
  • G2 railway bridge precast beam
  • G2 bridge, prestress design
Close ( Click on the image )

PROJECT DETAILS

Owner: ERGA OSE A.E
Construction: AKTOR
Location: Ikonio
Bridge arrangement: 5 span bridge total length 146.50m
Deck section: with 5 precast prestressed beams with H=2.15m, and cast in situ slab 25cm
Prestress: consists of 3 cables 11T15 and 1 cable 10T15
Foundation: spread footing
Services: Complete Structural Design
Comments: Design has been done as per German Code for Railway Bridges UIC 71 and Greek ant seismic Code E39/99.